2021 BMW M5 - WBS83CH04MCH31336

4.4L 8 AUTOMATIC with 18,765 miles on it, located in IL - CHICAGO NORTH

$25,250*

*Current Bid *Not Final Price Sold
Auction: Copart
Make: BMW
Model: M5
Year: BMW
VIN: WBS83CH04MCH31336
Engine: 4.4L 8
Fuel: GAS
Transmission: AUTOMATIC
Drive: All wheel drive
Doc Type: SC
Odometer: 18,765 mi
Highlights:
Seller:
Primary Damage: ALL OVER
Secondary Damage:
ERV: $83,374
Keys: Yes
Location: IL - CHICAGO NORTH
auction_datetime: 2024-06-04 13:00:00 -0400
sale_type: On Minimum Bid

Copart is a leading global digital marketplace connecting vehicle buyers and sellers.

This 2021 BMW M5 is available for sale at Copart auction. VIN number is WBS83CH04MCH31336.
It has 18,765 miles on it. It is equipped with 4.4L 8 GAS Diesel engine and has All wheel drive.
The damage is announced as ALL OVER, . Estimated Retail Value is listed as $83,374.

You can review pictures of the car to determine its condition. It is also possible to order a detailed report on Copart website.
Auction will be held on IL - CHICAGO NORTH, at 2024-06-04 13:00:00 -0400.

These materials have been prepared for informational purposes only and do not constitute investment advice of any kind.

Hide this page from the website

Similar Vehicles

Browse through similar vehicles that has are present in our listings.

Sold
2021 BMW M5
0 mi
Current Bid: $425
2022 BMW M5
mi
Current Bid: $0
2021 BMW M5
27,519 mi
Current Bid: $0
2021 BMW M5
62,382 mi
Current Bid: $0
2022 BMW M5 CS
mi
Current Bid: $0
scroll up