2022 BMW M5 - WBS83CH02NCK69650
4.4L 8 AUTOMATIC with 46,367 miles on it, located in CA - SUN VALLEY$5,100*
*Current Bid *Not Final Price Sold| Auction: | Copart |
| Make: | BMW |
| Model: | M5 |
| Year: | BMW |
| VIN: | WBS83CH02NCK69650 |
| Engine: | 4.4L 8 |
| Fuel: | GAS |
| Transmission: | AUTOMATIC |
| Drive: | All wheel drive |
| Doc Type: | SC |
| Odometer: | 46,367 mi |
| Highlights: | |
| Seller: | |
| Primary Damage: | FRONT END |
| Secondary Damage: | SIDE |
| ERV: | $82,647 |
| Keys: | Yes |
| Location: | CA - SUN VALLEY |
| auction_datetime: | 2024-03-27 15:00:00 -0400 |
| sale_type: | On Approval |
Copart
is a leading global digital marketplace connecting vehicle buyers and sellers.
This
2022 BMW M5
is available for sale at
Copart
auction.
VIN number is
WBS83CH02NCK69650.
It has 46,367 miles on it.
It is equipped with 4.4L 8 GAS Diesel engine and has All wheel drive.
The damage is announced as FRONT END, SIDE.
Estimated Retail Value is listed as $82,647.
You can review pictures of the car to determine its condition. It is also possible to order a detailed report on
Copart
website.
Auction will be held on CA - SUN VALLEY, at 2024-03-27 15:00:00 -0400.
These materials have been prepared for informational purposes only and do not constitute investment advice of any kind.
Hide this page from the website
Similar Vehicles
Browse through similar vehicles that has are present in our listings.