2024 BMW M3 COMPETITION XDRIVE - WBS43AY06RFS05683
3.0L I-6 DI, DOHC, VVT, TURBO, 543HP Automatic with 277 miles on it, located in Long Island (NY)$0*
*Current Bid *Not Final Price| Auction: | Iaai |
| Make: | BMW |
| Model: | M3 |
| Year: | BMW |
| VIN: | WBS43AY06RFS05683 |
| Engine: | 3.0L I-6 DI, DOHC, VVT, TURBO, 543HP |
| Fuel: | Gasoline |
| Transmission: | Automatic |
| Drive: | All Wheel Drive |
| Doc Type: | Run & Drive |
| Odometer: | 277 mi |
| Highlights: | |
| Seller: | |
| Primary Damage: | RIGHT REAR |
| Secondary Damage: | |
| ERV: | $87,958 |
| Keys: | Yes |
| Location: | Long Island (NY) |
| sale_type: |
Iaai
is a leading global digital marketplace connecting vehicle buyers and sellers.
This
2024 BMW M3 COMPETITION XDRIVE
is available for sale at
Iaai
auction.
VIN number is
WBS43AY06RFS05683.
It has 277 miles on it.
It is equipped with 3.0L I-6 DI, DOHC, VVT, TURBO, 543HP Gasoline Diesel engine and has All Wheel Drive.
The damage is announced as RIGHT REAR, .
Estimated Retail Value is listed as $87,958.
You can review pictures of the car to determine its condition. It is also possible to order a detailed report on
Iaai
website.
Auction will be held on Long Island (NY), at .
These materials have been prepared for informational purposes only and do not constitute investment advice of any kind.
Hide this page from the website
Similar Vehicles
Browse through similar vehicles that has are present in our listings.